Tasks Completed & Measures Taken

1. Pre start site visit – to avoid any issues or potential delays.
2. All RAMs and Lift plans approved before arriving at site.
3. Full package options including supply of materials.
4. HSEQ audit completed on every job to ensure the highest standards are adhered to.
5. All operatives CSCS qualified, SSSTS supervisor with 3 day first aid minimum in all teams.
6. Daily reports and weekly costings reported to keep records up to date.
7. Options for temporary works guide wall design.
8. Options for temporary works shutter design.
9. Collaboration and flexibility to meet client program needs.
10. Supply of 5 ton 360º excavator with height and slew restrictor fitted.
11. On site change of design to temporary works to meet client needs, adding in increment L steps due to the sloped access to the under bridge.
12. Dewatering due to very high water table

Client Feedback

With the high frequency of changes start dates / sequencing or these difficult projects, Acero demonstrated their flexibility in accommodating the many changes during the pre-construction phase, supporting Keller throughout and ensuring resource could be provided when required. Their communication ensured everyone was on the same page at al times, reducing any confusion and minimising any unplanned events and costs. The product installed was of high quality and the programme was met. The safety culture within their team was also of a very high standard when working adjacent to the rig and on other site operations -exclusion zones were in place, housekeeping was good and open excavations were protected at all times