Tasks Completed & Measures Taken

• Pre start site visit – to avoid any issues or potential delays.
• All RAMs and Lift plans approved before arriving at site.
• Full package options including supply of materials.
• HSEQ audit completed on every job to ensure the highest standards are adhered to.
• All operatives CSCS qualified, SSSTS supervisor with 3 day first aid minimum in all teams.
• Daily reports and weekly costings reported to keep records up to date.
• Options for temporary works guide wall design.
• Options for temporary works shutter design.
• Collaboration and flexibility to meet client program needs.
• Environmentally friendly concrete to reduce carbon footprint.
• Multiple inter site moves and centre changes to maintain work flow.

Client Feedback

Southampton was the first project on which we collaborated with Acero, They built a guide wall to suit the secant wall construction we were completing. Through out the lifecycle of the project, Acero were professional, flexible and supportive. During pre-construction, the suitability  (quality, may be a better word) of their HSEQ paperwork and pre start visit ensured a smooth mobilisations process. This was followed by a construction programme that we completed safety. on time and to use correct level quality outlined in the pre-construction requirements, Both keller and the main client were extremely impressed with the finished product.