Tasks Completed & Measures Taken

• Pre start site visit. – to avoid any issues or potential delays
• All RAMs and Lift plans approved before arriving at site
• Full package options including supply of materials.
• HSEQ audit completed on every job to ensure the highest standards are adhered to.
• Al operatives CPCS and CSCS qualified
• Daily reports and weekly costings reported to keep records upto date.
• Options for temporary works guide wall design
• Options for temporary works shutter design
• Collaboration and flexibility to meet client program needs
•Multiple onsite centre changes to maintain work flow around directional changes.

Client Feedback

With the high frequency of changes start dates / sequencing of these difficult projects, Acero demonstrated their flexibility in accommodating the many changes during the pre-construction phase, supporting Keller throughout and ensuring resource could be provided when required. Their communication ensured everyone was on the same page at al times, reducing any confusion and minimising any unplanned events and costs. The product installed was of high quality and the programme was met. The safety culture within their team was also of a very high standard when working adjacent to the rig and on other site operations – exclusion zones were in place, housekeeping was good and open excavations were
protected at all times