Tasks Completed & Measures Taken

• Pre start site visit – to avoid any issues or potential delays.
• All RAMs and Lift plans approved before arriving at site.
• Full package options including supply of materials.
• HSEQ audit completed on every job to ensure the highest standards are adhered to.
• All operatives CSCS qualified, SSSTS supervisor with 3 day first aid minimum in all teams.
• Daily reports and weekly costings reported to keep records up to date.
• Options for temporary works guide wall design.
• Options for temporary works shutter design.
• Collaboration and flexibility to meet client program needs.
• Environmentally friendly concrete to reduce carbon footprint.
• Multiple inter site moves and centre changes to maintain work flow.