Open/Close Menu Delivering reliable piling project support

Location: Peel Ports, Port of
Liverpool
Client: Keller
Opening: 900mm
Number: 2000:
Restrictions: Dock Edge

Location: Woolston – Southampton
Client: Keller
Opening: 1200mm
Length: 89.14m
Dia: 28.375m
Radius: 14.1875m

Location: Wendover Green Tunnel,
North Cutting, Wendover
Client: BKJV (Bauer Keller Joint
Venture/Hs2)
Opening: 850/1050mm
Length: 1500m
Steps: 1000/1500mm
Restrictions: Overhead Powerlines

Location: Oxford University Campus
Client: Central Piling
Opening: 770mm
Length: 146m
Step in Platform/Guide Wall: 1.5m
Dia: 750mm

Location: Wendover Green Tunnel,
North Cutting, Wendover
Client: BKJV (Bauer Keller Joint
Venture/Hs2)
Size: 552.5m2 Brush Finish (with
500mm upstand) & 273.6m2
power float finish+-0/6mm

Location: Kings Cross, Camden,
London
Client: MH Getjar
Opening: 900mm
Length: 249m
Step in Platform/Guide Wall: 1.2m
Dia: 880mm
Construction Period: December 2023
– April 2024 over 3 visits

Location: Boltey Road, Oxford
Client: Keller Geotechnique
Opening: 520/530mm
Length: 267m
Construction Period: July 2023

Location: Openshaw Park, Bury
Client: J.M Piling
Opening: 900mm
Length: 44m
Dia: 880mm
Construction period: February 2024

Location: Wandsworth, London
Client: Keller
Opening: 620mm
Length: 100m
Dia: 600mm
Construction Period: December
2023 – January 2024

Location: Slough, Berkshire
Client: Keller Foundations
Opening: 620mm
Length: 127.8m
Dia: 600mm
Construction Period: June 2023